RFQ Preparation Checklist
- Prototype quantity and test plan
- Batch forecast and expected release schedule
- Critical inspection points
- Packaging, labeling, and destination requirements
Controlled transition from actuator component prototypes to repeatable batch machining and export delivery.

| Program Metric | Typical Range | Procurement Value |
|---|---|---|
| Sample-to-production readiness | Gate-based | Clear release gates reduce rework when moving from prototype to batch production. |
| First-pass yield target | ≥ 95% at FAI gate | High first-pass yield at sample stage predicts stable batch production. Yield below 90% signals process risk that must be resolved before batch release. |



Yes. Prototype scope should include acceptance criteria and the expected production path.
We use the same CNC program, fixtures, and tooling for samples and production. FAI data from samples becomes the baseline for batch SPC monitoring. No hand-polishing or selective measurement.
Inquiry Email
Include drawings, material, finish, tolerances, quantity, and delivery location.